News

Contact Us

  • Email:qdsw87@qdswsteel.cn
  • Address:Room 3109, Building 2, No. 39 Shiling Rd, Qingdao, China
  • Mobile:0086-18669803758
  • Tel:0086-18669803758

1000m3 double membrane biogas storage holder in biogas fermenter industrial

Author:admin Time:2021-08-11

1000m3 double membrane biogas storage holder in biogas fermenter industrial

The double-film flexible gas storage tank is processed by using the film material and is divided into inner and outer layers and an additional base film. The airtight space with a closed capacity variable between the inner membrane and the base membrane is mainly used for storing biogas. The outer membrane and the inner membrane are inflated by an external pressure control system to form a certain pressure ratio in the inner airbag. Then the biogas is sent out.

biogas project equipment set with fermentation storage and utilization



biogas project equipment set with fermentation storage and utilization


Volume size of fermentation tankPower generating supporting gas tank
Model(m³)Diameter(m)Height(m)Effective volume(m³)Total volume(m³)Gas tank volume(m³)Gas tank height(m)
1005.355.43110120382.70
2006.886.05210220803.40
3008.406.053003301504.20
4009.176.634004401904.50
5009.937.255205601503.40
60010.707.256106502003.85
70010.708.457107602404.42
80011.468.458208702504.20
90012.228.459309903004.42
100012.998.45105511503504.60


Volume size of fermentation tankHousehold type supporting gas tank
Model(m³)Diameter(m)Height(m)Effective volume(m³)Total volume(m³)Gas tank volume(m³)Gas tank height(m)
1005.355.43110120382.70
2006.886.05210220803.40
3008.406.053003301504.20
4009.176.634004401904.50
5009.937.255205602405.00
60010.707.256106502905.40
70010.708.457107603005.40
80011.468.458208703505.70
90012.228.459309904506.10
100012.998.45105511505006.50



biogas project equipment set with fermentation storage and utilization

biogas project equipment set with fermentation storage and utilization

biogas project equipment set with fermentation storage and utilization

The double-film flexible gas storage tank is processed by using the film material and is divided into inner and outer layers and an additional base film. The airtight space with a closed capacity variable between the inner membrane and the base membrane is mainly used for storing biogas. The outer membrane and the inner membrane are inflated by an external pressure control system to form a certain pressure ratio in the inner airbag. Then the biogas is sent out.

biogas project equipment set with fermentation storage and utilization



biogas project equipment set with fermentation storage and utilization


Volume size of fermentation tankPower generating supporting gas tank
Model(m³)Diameter(m)Height(m)Effective volume(m³)Total volume(m³)Gas tank volume(m³)Gas tank height(m)
1005.355.43110120382.70
2006.886.05210220803.40
3008.406.053003301504.20
4009.176.634004401904.50
5009.937.255205601503.40
60010.707.256106502003.85
70010.708.457107602404.42
80011.468.458208702504.20
90012.228.459309903004.42
100012.998.45105511503504.60


Volume size of fermentation tankHousehold type supporting gas tank
Model(m³)Diameter(m)Height(m)Effective volume(m³)Total volume(m³)Gas tank volume(m³)Gas tank height(m)
1005.355.43110120382.70
2006.886.05210220803.40
3008.406.053003301504.20
4009.176.634004401904.50
5009.937.255205602405.00
60010.707.256106502905.40
70010.708.457107603005.40
80011.468.458208703505.70
90012.228.459309904506.10
100012.998.45105511505006.50



biogas project equipment set with fermentation storage and utilization

biogas project equipment set with fermentation storage and utilization

Contact Us

Add: Room 3109, Building 2, No. 39 Shiling Rd, Qingdao, China
Tel: 0086-18669803758
Mobile: 0086-18669803758
0.023186s